Description: This dataset contains Orange County Max Chief’s Report Paragraph 3 (Authorized) project alignment segments. The GIS data was developed by the USACE Galveston District E&C Geospatial Team and was originally requested to be published by the PDT Technical Lead Jan 2025.Information is broken down into the following details:1. Alignment Type2. Location3. Contract4. QuantitiesTechnical Lead Notes: The Chief’s Report – Paragraph 3: the PDT will evaluate and document the complete analysis and performance of the authorized project features as described in Paragraph 3 of the 2017 Chief’s report. This will not include any post authorization changes incurred through PED activities but is simply restating what is described in the 2017 Feasibility Report.Update Frequency: This dataset is updated as needed.Data Owner: This dataset was originally requested by the SWG Orange Engineering Technical Lead, POC: Randy Lord, 918.669.7456, charles.r.lord@usace.army.mil.Geospatial Data Steward: This dataset was developed and published by the USACE Galveston District Geospatial Team, POC: Heather Hilbert, 409.766.3855, Heather.L.Hilbert@usace.army.mil, Alternative POC: Geospatial Team: ceswg-ecg-geospatial@usace.army.mil
Service Item Id: 056791dfe74e4e1da28c9570406e2b8f
Copyright Text: United States Army Corps of Engineers - Galveston District, Engineering and Construction, SWG Geospatial Branch